InstallationInspection
BRAKE > Front Disc RotorINSPECTION1. DISC ROTOR RUNOUT CHECK1. Check the hub unit COMPL - front axle for free play and runout before the inspection of disc rotor runout limit. Front Hub Unit Bearing > INSPECTION">2. Tighten the wheel nuts to secure disc rotor.3. Set a dial gauge 10 mm ...
Removal
MANUAL TRANSMISSION AND DIFFERENTIAL(5MT) > Main Shaft AssemblyREMOVAL1. Remove the manual transmission assembly from the vehicle. Manual Transmission Assembly > REMOVAL">2. Remove the transfer case together with the extension case assembly. Transfer Case and Extension Case Assembly ...
Removal
FUEL INJECTION (FUEL SYSTEMS)(H4DO) > Tumble Generator Valve ActuatorREMOVAL1. Disconnect the ground cable from battery.2. Disconnect the connector (A) from tumble generator valve assembly, and remove the tumble generator valve actuator.• RH side• LH side ...