Ornament InstallationInstallation
MECHANICAL(H4DO) > Timing Chain AssemblyINSTALLATION1. TIMING CHAIN LHNOTE:• Be careful that the foreign matter is not into or onto the assembled component during installation.• Apply engine oil to all component parts of the timing chain.1. Prepare to attach the chain tensioner LH.(1) ...
Inspection
CONTINUOUSLY VARIABLE TRANSMISSION(TR580) > Inhibitor SwitchINSPECTIONWhen the driving condition or starter motor operation is improper, first check the shift linkage for improper operation. If the shift linkage is functioning properly, check the inhibitor switch.1. Remove the clip (A) from the a ...
Specification
IGNITION(H4DO) > General DescriptionSPECIFICATIONItemSpecificationsIgnition coilManufacturer and typeHitachi: EIC-2230Ignition systemIndependent ignition coilSpark plugManufacturer and typeNGK: SILZKAR7B11Thread size (diameter, pitch, length)mm12, 1.25, 26.5Spark plug gapmm (in)Standard1.0 — 1. ...