MANUAL TRANSMISSION AND DIFFERENTIAL(5MT) > Switches and Harness
INSTALLATION
1. BACK-UP LIGHT AND NEUTRAL POSITION SWITCH
1. Install the back-up light switch & neutral position switch with the harness.
NOTE:
Use a new gasket.
Tightening torque:
32.3 N·m (3.3 kgf-m, 23.8 ft-lb)
(A) | Neutral position switch |
(B) | Back-up light switch |
2. Secure the harness on each clip.
3. Lower the vehicle.
4. Connect the connectors for back-up light switch and neutral position switch, and secure the connector to the bracket.
5. Install the air intake boot. Air Intake Boot > INSTALLATION">
6. Connect the battery ground terminal.
Installation
AIRBAG SYSTEM > Airbag Control ModuleINSTALLATIONCAUTION:Do not reuse the bolt and nut.Always use new bolts and nuts for them.1. Before installation, inspect the following items and replace any faulty part with a new one.• Control module is deformed.• Control module connector is damag ...
Installation
MECHANICAL(H4DO) > Crank PulleyINSTALLATION1. Degrease the press-fit section for the chain cover front oil seal, and install the front oil seal to the chain cover using ST.CAUTION:Do not apply fluid such as engine oil to the front oil seal and the chain cover; otherwise engine oil leakage may occ ...
Installation
HVAC SYSTEM (HEATER, VENTILATOR AND A/C) > Heater and Cooling UnitINSTALLATIONCAUTION:• Replace O-rings with new parts and install securely.• Before handling the airbag system components, refer to “CAUTION” of “General Description” in “AIRBAG SYSTEM&rdquo ...